Pool Under Construction

What is the best time of year to build a pool?

A Guide to Planning the Perfect Pool Project

Building a pool is an exciting investment that transforms any backyard into a personal retreat. But did you know that choosing the right season to start construction can have a big impact on your pool-building experience? Timing affects everything from costs and availability of builders to the speed of city permits and project completion. In this guide, we’ll explore the best time of year to build a pool and why planning ahead can make a huge difference in cost savings, efficiency, and the overall timeline of your pool project.

1. Why Fall and Winter are the Best Seasons to Build a Pool

Builder Availability and Lower Demand

One of the biggest benefits of starting a pool project in the fall or winter is that builders are typically more available. The spring and summer months are the peak seasons for pool construction, so scheduling can become challenging as builders’ workloads fill up. In the fall, however, builders have open schedules, making it easier for you to secure your preferred timeline. Many pool builders also offer off-season discounts or promotions to incentivize projects during these quieter months. By planning your pool for the fall or winter, you’re more likely to enjoy better rates, flexibility, and quicker project timelines.

2. Advantages of Building a Pool in the Off-Season

  1. Faster Permit Approvals

Permitting is a necessary step before construction begins, and it can be a lengthy process if you’re planning your pool project during peak season. When permit offices are flooded with requests in spring and summer, it can take weeks or even months to obtain the necessary permits. In contrast, fall and winter are typically less busy times for permitting, so applications are processed faster. This means you can get through this critical step with fewer delays, allowing your project to stay on track.

  1. Get Swimming by Spring

If you start your pool construction in the winter, you’re likely to have everything ready by spring. Building a pool takes time, and starting early ensures you’ll have a fully functional pool just in time for warmer weather. By planning ahead and constructing in the fall or winter, you avoid the waitlist and lengthy delays of summer projects, ensuring your pool is ready when you need it most.

  1. More Time for Other Backyard Projects

Once your pool project is underway, you’ll have time to focus on other complementary projects, such as landscaping, patio installations, or setting up a pool safety fence. Having a clear schedule allows for efficient planning of additional features that will enhance your backyard. By having your pool completed by early spring, you can continue building out your ideal backyard without missing out on precious outdoor time.

3. Important Considerations When Choosing a Start Date

Choosing the best time to build a pool involves more than just selecting a season. Weather, regional factors, and labor costs also play a role in project timing.

  1. Weather Conditions in Your Area

In certain regions, winter conditions like frozen ground or heavy snowfall may complicate or delay pool construction. For instance, areas with harsh winters may experience challenges with digging or concrete pouring, as frozen ground can be difficult to excavate and concrete may not set correctly in extremely cold conditions. For those in warmer climates, however, winter is ideal for building as it offers cooler temperatures that are conducive to construction and reduces the chances of weather-related interruptions.

  1. Avoid the Rainy Season

In regions with rainy or monsoon seasons, planning around heavy rains is essential to prevent delays. Rain can hinder progress, especially during the excavation phase or when setting up concrete or plumbing work. By timing your project to avoid the rainiest months, you can maintain a more predictable timeline and reduce the risk of mud and flooding that can slow down construction.

  1. Labor Cost Savings in the Off-Season

Labor costs can fluctuate based on demand, and fall and winter months are generally less busy for pool specialists and contractors. As demand drops, many professionals offer more competitive rates, allowing you to save on labor expenses. By scheduling your project during this quieter period, you benefit from more affordable labor and easier access to experienced builders.

  1. Manufacturers’ Price Increases

Pool materials, including pumps, filters, liners, and tile, often see a price increase at the beginning of the new year. Manufacturers frequently raise their prices in January, so booking a builder before the new year can help you lock in current rates and avoid paying more for materials. Starting your pool project in the late fall or early winter ensures you’ll get the best prices on materials before annual price hikes.

4. Summary: When is the Best Time to Start Building Your Pool?

For most homeowners, the best time to start a pool project is during the fall or early winter. By planning ahead and beginning construction in the off-season, you’ll benefit from greater builder availability, faster permitting, potential savings on labor and materials, and a completed pool by spring. Timing your project around seasonal weather patterns and demand cycles can have a major impact on your overall experience, ensuring a smooth, efficient, and cost-effective build.

Planning Your Pool Project? Get Started Today!

At Desert Oasis Custom Pools and Landscapes, we specialize in building custom pools that turn backyards into beautiful retreats. If you’re ready to start your pool project or want to discuss the best timeline for your build, our expert team is here to help. Contact us today to learn more about our pool design and construction services. Let’s transform your backyard into the oasis you’ve always dreamed of!

 

Choosing the correct pool builder

The Ultimate Guide to Choosing the Right Pool Builder

Building a custom pool is an exciting journey toward transforming your backyard into a luxurious retreat. However, selecting the right pool builder is crucial to ensuring a successful project and a pool that meets your dreams and expectations. Here’s your comprehensive guide to vetting pool builders, based on industry best practices and expert advice.

1. Verify Credentials and Insurance

The first step in choosing a reputable pool builder is to verify their credentials. Ensure the company is licensed and insured. Request the license number and confirm its validity with the appropriate regulatory body. Also, make sure the builder has comprehensive insurance, including general liability and workers’ compensation. This protects you from potential liabilities and ensures that the builder is serious about their business.

Important Tip: Always check if the subcontractors involved in the project are also covered under the builder’s insurance policy.

2. Understand the Payment Schedule

A clear and fair payment schedule is essential for a smooth project. Most builders require an initial deposit followed by milestone payments as the project progresses. Be cautious if a builder demands a large upfront payment or if the pricing seems unusually low. Payments should be made via check or credit card to ensure you can dispute any issues if necessary.

Red Flag: Avoid builders who require cash payments or those with a suspiciously low bid.

3. Assess Experience and Past Work

Experience matters. Inquire about how long the builder has been in business and the number of pools they have installed. A builder with extensive experience and a solid track record is likely to handle your project with greater expertise.

Questions to Ask:

  • How many pools have you installed in the past year?
  • Can you provide references from recent projects?

Check their portfolio and request to see completed projects similar to what you envision. A reputable builder should be able to provide a list of satisfied customers and examples of their work.

4. Check Reviews and Testimonials

Online reviews and testimonials are invaluable for assessing a pool builder’s reputation. Look for builders with a high ratio of positive reviews. Verify their responses to negative feedback to gauge how they handle client concerns and issues.

Tip: Use platforms like Google, Yelp, and the builder’s own website to gather feedback and see real customer experiences.

5. Review Warranty and Contract Details

A thorough warranty is crucial. Ensure that the pool builder offers a workmanship warranty that covers potential issues such as structural problems and plumbing leaks. Review the warranty terms carefully, including what it covers and the duration.

Contract Checklist:

  • Ensure all aspects of the project, including design, installation, and any additional features, are detailed in the contract.
  • Verify that the estimated completion date is included.
  • Ensure all “throw-ins” or extra work is clearly listed and priced.

6. Evaluate Installation Practices and Design Planning

Good builders follow best practices for installation and design. Confirm that the builder provides a detailed plan before starting the project, including the pool’s exact location, pump and filter system placement, and any necessary landscaping or structural adjustments.

Design Plan Checklist:

  • Pool location
  • Pump and filter system placement
  • Elevation and drainage
  • Patio dimensions and additional structures

7. Consider Product Quality and Brand Reputation

The quality of materials and products used can significantly impact the longevity and appearance of your pool. Ensure the builder uses high-quality products with good reviews and solid warranties. Research the brands they use to confirm their reliability and performance.

8. Trust Your Instincts

Lastly, trust your instincts. If something feels off during your interactions with the builder, consider it a warning sign. Ensure you feel comfortable with the builder’s communication and professionalism.

Questions to Reflect On:

  • Are the builder’s credentials and contact information accurate?
  • Do you feel pressured to make decisions quickly?
  • How responsive is the builder to your inquiries?

Why Choose Desert Oasis Pools and Landscapes?

At Desert Oasis Pools and Landscapes, we combine years of experience with a commitment to quality and customer satisfaction. We offer comprehensive design and installation services tailored to your specific needs and preferences. Our team ensures that every detail, from the initial design to the final touches, is executed with precision and care.

Ready to turn your backyard into a paradise? Contact us today to schedule a consultation and discover how Desert Oasis Pools and Landscapes can make your dream pool a reality.

 

 

New Pool Build

The Ultimate Timeline for Building a Pool in Arizona: A Step-by-Step Guide

Building a custom pool in Arizona is an exciting way to turn your backyard into a luxurious retreat. However, many homeowners underestimate the time and steps involved, which can lead to frustrations and delays. This step-by-step guide from Desert Oasis Pools and Landscapes will provide you with a clear understanding of what to expect at each stage of the pool building process, from initial design to completion.

Step 1: Pool Design – 1 to 2 Weeks

The first phase of building a custom pool is the design process. During this step, you’ll work with a professional pool designer to bring your ideas to life and explore what’s possible within your space. Design consultations include discussing details like pool shape, depth, style, and add-ons. Modern 3D modeling software lets you visualize exactly how your pool will look, down to the last detail.

Key Steps:

  • Meeting with a pool designer to discuss your vision
  • Reviewing key features such as size, shape, and color
  • Finalizing any custom features like tanning ledges, spas, or waterfalls
  • Using 3D modeling for a realistic view of the final layout

After completing the design, you’ll have a clear picture of your future pool and can confidently move forward with the project.

Step 2: Permitting and Engineering – 4 to 8 Weeks

The permitting phase is crucial but often unpredictable. While some municipalities in Arizona, such as Chandler, Gilbert, and Mesa, process permits in a few weeks, others may take longer due to varying regional regulations and requirements. It’s not unusual for delays to occur if more information is needed or if there’s a high volume of applications.

Key Considerations:

  • Your pool builder will handle the permit process, ensuring all necessary documents are filed
  • Allow extra time for possible delays in municipal approvals
  • Engineering plans may also need to be submitted during this phase

The permitting stage typically takes around 4 to 8 weeks but can sometimes be completed sooner. The wait can be frustrating, but having permits in order ensures that your project meets local building codes.

Step 3: Excavation – 1 to 2 Days

Once permits are secured, construction begins with excavation. Excavating the pool site generally takes just a day, although unforeseen challenges like encountering hard rock or clay (commonly found in Arizona) may extend this phase slightly. Limited access to your yard can also slow things down, but on average, excavation is quick and straightforward.

Potential Challenges:

  • Hard rock or caliche, which can slow down digging
  • Tight or limited backyard access for excavation equipment

After excavation, your yard will start to show the first signs of transformation.

Step 4: Plumbing, Steel, Gas, and Electrical – 1 to 3 Days

The next step involves installing the essential systems that support your pool’s functionality and aesthetics. Plumbing, steel framework, electrical, and gas lines are put in place, forming the foundation of your pool. This stage also includes key inspections to ensure everything is up to code before the next steps. Depending on the complexity of your pool design, this phase typically takes one to three days but may require additional inspection time.

Features Installed:

  • Plumbing for water circulation and filtration
  • Steel framework for structural support
  • Electrical wiring for lighting and water features
  • Gas lines for options like hot tubs or outdoor kitchens

City inspections ensure these systems are properly installed and safe before moving to the next phase.

Step 5: Pool Shell Installation – 4 to 6 Weeks

Now it’s time to shape the heart of your pool. Shotcrete, a durable concrete material, is applied to form the pool shell. This phase requires patience, as the shell must cure properly to prevent cracks and ensure longevity. Although it may seem like progress has slowed, the curing process is vital to creating a strong, lasting pool structure.

Important Considerations:

  • Shotcrete is sprayed to form the pool shell
  • Curing time, typically several weeks, allows the concrete to set fully
  • Inspecting the shell for any imperfections is essential before adding finishing touches

During this time, you may feel as though construction has paused, but curing ensures the pool’s structural integrity for years to come.

Final Steps: Pool Finishes, Landscaping, and Clean-Up – 2 to 3 Weeks

Once the pool shell has cured, the final stage involves adding finishing touches like tile, coping, and plaster, which give your pool its color and aesthetic appeal. This is also when any additional landscaping and custom features, like waterfalls or seating areas, are installed. Once the finish is complete, the pool is filled with water and tested to ensure everything is functioning as planned.

Finishing Steps:

  • Adding tile, coping, and plaster to complete the pool’s look
  • Landscaping and surrounding hardscapes to complement your backyard design
  • Final inspection and water testing

After about two to three weeks of final touches, your pool will be ready for use, transforming your backyard into a stunning oasis.

Total Timeline: Approximately 8 to 12 Weeks

Building a custom pool in Arizona typically takes between 8 and 12 weeks from start to finish, depending on design complexity, permitting timelines, and any unexpected delays. By understanding each stage, you can plan effectively and look forward to enjoying your new pool as soon as it’s ready. At Desert Oasis Pools and Landscapes, we’re here to make this process as seamless and enjoyable as possible, creating the perfect retreat for your Arizona home.